General Information
Thu Duc City, Ho Chi Minh City
Project Overview – Thủ Thiêm The River
Thu Thiem Zeit River Project is master-planned across 3 land lots 3.3, 3.7, and 3.11 within functional zone 3 of the Thu Thiem Urban Area. The project’s frontage extends across 3 major arterial roads: Nguyen Co Thach Street, Ring Road Boulevard, and the Central Lake Waterfront Road.
– Commercial Name: Thủ Thiêm The River
– Location: Nguyen Co Thach Street, Thu Thiem Ward, Thu Duc City, Ho Chi Minh City.
– Developer: Vietnam GE Enterprise Company Limited (VGSE)
– Developer: GS Engineering & Construction (GS E&C)
– Land area: 33,282m2
– Scale: 6 towers, 12 – 32 stories with 817 apartments
– Apartment area: 60 – 200m2 (1 – 4 bedrooms)
– Management Company: Xi S&D
– Commencement Date: December 2020
– Handover Timeline (estimated): 2023
Project Location – Infrastructure
With its prime location at the intersection of Nguyen Co Thach Street and Tran Bach Dang Street (Ring Road Boulevard), the apartments at Thu Thiem Zeit River offer expansive views of the bustling yet airy new urban area, with wide-open vistas toward the future financial center and central lake.
Ring Road Boulevard is considered one of the four major arterial roads serving as vital transportation connectors linking central districts of the city. This corridor is gradually developing into a dynamic urban avenue with business and mixed-use residential complexes along both sides, becoming a future hub for cultural events and festivals. This means Thu Thiem Zeit River is situated on Thu Thiem’s most vibrant thoroughfare.
Furthermore, this area is planned with low building density, with tower heights gradually decreasing towards the Saigon River and central lake. Therefore, Thu Thiem Zeit River apartments not only possess unlimited river views facing the Saigon River, but also open to the expansive natural landscape of the central lake and vibrant daily living rhythm.
From the location of Thu Thiem Zeit River project, residents can quickly connect to important downtown locations such as:
– 02 minutes from Thủ Thiêm The River project location to Thủ Thiêm Central Plaza
– 03 minutes from Thủ Thiêm The River project location to Thủ Thiêm Pedestrian Bridge
– 04 minutes from Thủ Thiêm The River project location to Bạch Đằng Monument
– 05 minutes from Thủ Thiêm The River project location to Nguyễn Huệ Street
– 07 minutes from Thủ Thiêm The River project location to District 4
– 15 minutes from Thủ Thiêm The River project location to District 7
With a long frontage on Nguyen Co Thach Road – the most prestigious clean boulevard in Thu Thiem Urban Area – the location of Thu Thiem Zeit River project is also a premier valuable coordinate thanks to abundant commercial value.
Prestigious amenity features
An exquisite collection of premium amenities thoughtfully arranged throughout the project is a privileged experience “comfortable like home, luxurious like a resort” designed for distinguished owners at Thu Thiem Zeit River.
– 4 commercial floors with numerous restaurants, cafes, and services
– BBQ Terrace
– Shopping Mall
– Swimming pool
– Rooftop Restaurant
– Community Activity Room
– Gym & Yoga Studio
– Spa services…
Integrated with multiple smart technologies
Behind the apartment door of Thu Thiem Zeit River, the bustling rhythm of life closes to make way for comfort. Every step of the homeowner touches integrated technology spanning throughout, elevating the experience to a smart living standard.
Smart Motion Sensor

Smart Lighting System
Smart Elevator System

Equipped with modern basement ventilation system, intelligent parking guidance system and emergency support system
Surrounding Amenities
Located at the prime center of the new Thu Thiem urban area, residents of Thu Thiem Zeit River will enjoy all existing surrounding amenities: system of schools at all levels and international schools, hospitals, shopping centers, entertainment areas,…
Thu Thiem Zeit River project enables your family to easily connect to iconic works of the new financial center in the future, such as:
– Exhibition Center
– Opera House
– Multi-purpose Sports Center
– Sports Stadium
– Southern Delta Resort
– Southern Delta Conservation Area
– Central Square, largest in Vietnam (approximately 21 hectares)
– Pedestrian bridge connecting directly across Mê Linh construction site
Currently, surrounding the Thu Thiem Zeit River project, various amenities and services already exist, such as:
– Upscale Restaurant and Coffee Shop on Nguyen Co Thach Street
– International school system including IPS, Wellspring, Canadian Elementary School, Vinschool
– Vinmec Hospital
– Pearl Plaza Shopping Center
– Zoo
DESIGN – FLOOR PLAN
Thủ Thiêm The River comprises 6 blocks ranging from 12-32 stories, with 1-2 basement levels. The podium will include 4 floors of retail and amenities. The project offers 817 residential units, including 4-story townhouses and shophouses with flexible floor plans to suit owner preferences for residential or business purposes. Currently, Phase 1 is launching, featuring 300 units (apartments and townhouses).
[/col] [/row] [scroll_to title=”Image Gallery” link=”#thuvien” bullet=”false”] [row style=”small”] [col span__sm=”12″ padding=”20px 20px 10px 20px” bg_color=”rgb(255, 255, 255)”]
IMAGE GALLERY
[/col] [col span=”6″ span__sm=”12″] [ux_gallery ids=”398,399,400,401″ style=”default” type=”slider” columns=”1″ image_size=”large” text_align=”center” text_size=”large”] [/col] [col span=”6″ span__sm=”12″] [ux_gallery ids=”398,400,401,399″ style=”default” type=”slider” columns=”1″ image_size=”large” text_align=”center” text_size=”large”] [/col] [/row] [scroll_to title=”Progress” link=”#tiendo” bullet=”false”] [row] [col span__sm=”12″ padding=”20px 20px 10px 20px” bg_color=”rgb(255, 255, 255)”]
PROJECT PROGRESS
Construction progress update for Thu Thiem Zeit River project through September 2023:
- Tower T1: Structural concrete work completed up to floor 25; exterior finishing work completed up to floor 23; interior painting work completed up to floor 22. Additionally, wooden door system installation has been completed from floor 8 to floor 13
- Tower T2: Structural concrete work for Tower T2 completed up to floor 29. Exterior finishing work completed up to floor 24 and tiling and base coat painting completed up to floor 15
- The amenities area and lower floors at the podium are currently undergoing exterior finishing and paint works;
- The swimming pool area comprises an infinity pool, Jacuzzi pool, soaking basin, and children’s play zone currently under construction and completion;
- The resident parking area has been completed.
PROJECT VIDEO CLIP
[/col] [/row] [row] [col span__sm=”12″]Quý khách hà ng vui lòng liên hệ trá»±c tiếp theo: HOTLINE TƯ VẤN 24/7:0902.601.689 hoặc cung cấp ná»™i dung theo mẫu bên dưới, chúng tôi há»— trợ tư vấn trong thá»i gian sá»›m nhất. Chân thà nh cảm Æ¡n Quý khách hà ng đã quan tâm đến các dá»± án nà y.
|
|
|
| Empire City | Metropole | The River |
| Zeit Thu Thiem | Sala Urban Area | Diamond Island |
| Define | Feliz en Vista | Grand Marina Saigon |








